‹ All calculators
Drywall
Sheets, joint compound, tape and screws for the walls and ceiling of a room.
Enter room dimensions to see results.
Assumptions
- Openings are deducted at 20 SF each.
- Compound ≈ one 4.5 gal bucket per 900 SF for tape plus two coats; tape ≈ one roll per 1,300 SF; screws ≈ one per SF, 320 per lb.
Planning numbers. Confirm quantities with your supplier, spec and local conditions before ordering.
Running a crew?HardHatOps — toolbox talks, time clock, sign-off records, daily duties. The field side.
Bidding and running jobs?IAOIntel — takeoffs, estimates, daily logs, spec intelligence. The office side.