‹ All calculators
Unit Price Builder
Build a sell price per unit from material, labor, equipment and subs, plus overhead and profit, then total the bid line.
Enter at least one cost per unit to see results.
Assumptions
- Overhead is applied to direct cost, profit to cost plus overhead. Change either if your books work differently.
Planning numbers. Confirm quantities with your supplier, spec and local conditions before ordering.
Running a crew?HardHatOps — toolbox talks, time clock, sign-off records, daily duties. The field side.
Bidding and running jobs?IAOIntel — takeoffs, estimates, daily logs, spec intelligence. The office side.